Industrial roof refurbishment across the West Midlands is usually about extending the life of profiled metal sheeting rather than replacing it, because cut-edge corrosion and failed fixings account for most of what looks like a worn-out roof. Book a free on-site survey; the scope for the industrial roof is written and priced before anyone starts.
- On site in 45 to 90 minutesEvery elevation photographed from ground level and ladder, and the roof void inspected from inside.
- A written report in two daysDefects separated into immediate, this season and monitor, with photographs against each.
- An itemised written scopeAgreed and signed before anyone starts, with no variation without a new figure.
Call the crew07446 375079
Monday to Friday, eight until six, and Saturday mornings. Emergency make-safe runs outside those hours.
Crews work across 8 Birmingham and Solihull districts: Sutton Coldfield, Harborne, Edgbaston, Moseley, Solihull, Erdington, Kings Heath and Selly Oak. Postcodes outside that run are quoted case by case rather than turned away.
- Free survey No charge for the survey, and none if the report says nothing needs doing.
- Own crews The people who survey the roof are the people who lay it. No subcontracting, no lead resale.
- Written scope first Quoted as an itemised scope agreed before work starts.
- Workmanship warranty Issued in writing on completion. Sole trader, no scheme registration.
Roll-formed steel or aluminium sheeting in long runs on purlins. What fails is rarely the sheet.
3 signs are visible from the ground: Rust spreading from the laps, Sheets lifting or rattling and Yellowed or cracked rooflights.
What we fix
What fails on an industrial metal roof?
Five things fail: cut-edge corrosion at the sheet laps, corroded fixings losing their clamping load, embrittled GRP rooflights, valley and eaves gutters rusting through, and sealed laps opening as the sheets move.
- A profiled metal sheet means roll-formed steel or aluminium sheeting laid in long runs on purlins.
- Cut-edge corrosion means rust spreading inward from the sheared laps where the coating was cut; the cut-edge treatment means corrosion removed, edges primed and encapsulated in a liquid coating system.
How it works
Gutters fail before sheets do.
- A sheared lap exposes uncoated steel which corrodes inward as cut-edge corrosion.
- Corroded fixings lose clamping load and allow a sheet movement and leakage.
- Overroofing installs a new system over the existing roof without exposing the occupied space.
- Aged GRP rooflight fails underfoot and is the main fall-through risk.
Straight answers
What is cut-edge corrosion and can it be treated?
Cut-edge corrosion is rust spreading inward from the sheared laps where the sheet's protective coating was cut during manufacture. It is treated by removing the corrosion, priming the edge and encapsulating it in a liquid coating system.
Hook bolts and self-drilling fixings corrode and lose clamping load, letting sheets move. GRP rooflights embrittle and become fragile long before the sheeting fails. Aged rooflights and cement sheet fail underfoot and are the main fall-through risk.
Does the roof need replacing or refurbishing?
Refurbishment suits roofs whose sheeting remains structurally sound with corrosion confined to laps and edges. Replacement suits perforated sheets, failed purlin fixings across the roof, or where an insulation upgrade justifies overroofing.
Overroofing is a new sheet system installed over the existing roof without stripping it; the gutter lining means existing valley and eaves gutters lined with a liquid or membrane system in situ. The option of the liquid coating is a full-roof coating system extending life where sheeting is sound but weathered.
Can the roof be replaced while we keep operating?
Yes. Overroofing installs a new system above the existing one without opening the building, and phased working by roof area keeps operations running. Access, noise and delivery timings are agreed with the site operator beforehand.
The insulation upgrade is achieved during overroofing without disturbing the occupied space below.
- Asbestos cement sheet presence: common on pre-ban industrial roofs; the register governs any work
How is safety handled on a fragile roof?
Rooflights and cement sheet are identified and mapped before any access, staging and edge protection are installed over fragile areas, a permit to work is obtained, and the building's asbestos register is consulted first.
Lining valley and eaves gutters in situ
It looks terminal and is not; treating and encapsulating the laps adds substantial life at a fraction of replacement cost. Sheeting frequently outlives its fixings, so a roof leaking at every lap needs refixing rather than recovering.
Arrange a roof condition survey
They embrittle invisibly and are the surface people fall through; identifying them is the first act of any survey. A new system over the old one avoids exposing the interior, which for a working warehouse is worth more than the material saving.
Profiled sheet, and 6 more
- profiled sheet
- cut-edge corrosion
- purlin
- hook bolt
- overroofing
- gutter lining
- fragile surface
Recent work
Job photographs are added as each contract completes, with the date, the district and the defect named in the caption.
Where we work
8 Birmingham and Solihull districts
- Sutton Coldfield
- Harborne
- Edgbaston
- Moseley
- Solihull
- Erdington
- Kings Heath
- Selly Oak
Postcodes outside that run are quoted case by case rather than turned away.
Related pages
Book a industrial roof survey
A survey takes forty-five to ninety minutes and the written report follows within two working days. Nothing is charged for the survey, and nothing is charged if the report says nothing needs doing.